Basic Info.
Product Description
1-Start from part design analysis
2-Mold design drawing and DFM report available so you can see how is the mold going to be before mold making
3-If product is complex,moldflow report will be present as well
4-In house mold making shop ensure you mold quality under well control.
5-Normally it takes 20-40 days to make mold,precise time depends on part design
Mould material | Plastic mould material: P20 steel, 718, 2738,H13, NAK80,2344,2343,S136,etc.... |
Fast mould design | can be within 1-3 working days after getting customer's drawings |
Lead time | Plastic moulds :3- 6 weeks after getting the mould design confirmation |
Mould testing | All of the moulds can be well tested before the shipments. Videos for testing the moulds are available. |
Minimum order: | small orders can be accepted |
Production capacity | 100 sets/month |
Port | shanghai |
Runner | Hot/cold |
Payment terms | L/C T/T Western Union Money Gram |
Mould making service | OEM/ODM service available |
After sales service | Available by our staff with more than 10 years of working experience in this field |
Good packages | In strong wooden pallets to avoid any damages during the long transportation |
Manufacturing and exporting experience for over 10 years. ISO 9001 approved &TS16949 approved .
Products are supplied to over 50 countries.
One-stop service for aluminum profiles, plastic parts, rubber parts, and moulds. Save time and save money for you.
In-house mold design and building capabilities.
No reclaimed material used to ensure high quality.
Keep secret to your idea and your design.
24 hours (two shifts) / 6 days for production.
Professional design team, mold maker engineer. OEM/ODM service.
Professional QC and R&D teams to assure high quality.
Professional sales team. Good English capabilities and communication skills.
No MOQ.
Prompt delivery. For prototype: 3-7 days. Production orders can be arranged specially to meet customer's urgent demands.
Geographical advantages: within 30 minutes to airport or sea port.