Basic Info.
Product Description
Foshan Sinogar Aluminium Co., Ltd, founded in 1995, locates in Foshan " China Aluminum Industrial City". In past 20 years, the company has obtained a rapid development, turned into a large modern enterprise of professional manufacturing of aluminum profiles and fabricated aluminum parts in China.
Foshan Sinogar Aluminium Co., Ltd, There are800 staff working in 600,000 Square metre factory area in Guangdong. 15 sets of extrusion lines ranged from 500mt to 3600mt. Annual capacity reaches 80,000 tons.
Our aluminium profiles and processing product cover more than 30 provinces and municipalities across the country and have been exported to more than 50 countries and regions around Asia, Africa, America and Europe, such as Indonesia, Philippines, Malaysia, South Africa, Spain, UK and Australia, and etc.
Aluminum sliding door | ||||
1. Standard notch design, which improves the performance of the whole window, realizes flexible opening, convenient use and security anti-theft function; 2. Reasonable drainage channel design to effectively prevent rainwater from penetrating; 3. The four corners of the sash are made of stainless steel corner reinforcement, and the 45 degree angle is more precise; 4. The frame is a double-track structure, and the frame and fan have unique drainage groove design; |
Aluminium Alloy | 6063,6060,6061,6463,5050, | |
Temper | T3-T8 | |
Quality Standard | GB/T 5237-2008, EN755-9,EN12020, JST,AA STANDARD. | |
Quality Certificate | ISO9001, ISO14001,OHSAS18001,DNV,QUALANOD, QUALICOAT | |
Useage | Construcion Window, door, curtain wall, hand railing,partition | |
Surface Treatment | Power coating: AKZO Noble, Tiger,DUPONT,JOTUN, etc. | |
PVDF: 2coated, 3 coated. | ||
Anodizing: Silver, Champagne, Bronze, Black, Gold, Imitating Steel,Titanium | ||
Wood grain: As per customers'samples. | ||
Polishing, Mechanical, Chemcial. | ||
Electrophoresis: Sliver,Champagne, Black, Golden,Titanium, etc. | ||
Processing | Drilling, Bending, Aluminium profile fabrication, Precise cutting ect. | |
MOQ | 100sqm | |
Packing | protection film + shrink plastic film or kraft paper. | |
Timber packing + Metal trolly; | ||
Payment Terms | TT 30% before production, the rest should be balanced before loading. |
ISO 9001:2008 Quality Management System; ISO 14001:2004 Environmetal Management System Certification granted. Sinogar Quality Standards full repsect with AS3715-2004; EN 755-2008; EN 12020-2008; GB/T5237.1-2000 & AAMA standards.
1.Q:How long for the cutting dies and received sample?
A: Depend on the size of dies, gernerally speaking, 7-10 days for die cutting, 3days-5days sampling after die ready.
2 Q:What is your lead time for production?
A: For one 40ft container, 3-4week after deposit confimred. 100 tons can be ready within 4-5 weeks.