- Overview
- Product Display
- Company Profile
- Our Deep Processing Line
- Application Scenario
- Certifications
- Packaging & Shipping
- FAQ
Basic Info.
Product Description
Custom aluminum extrusion profile parts | |
Mold Material | H13 |
Mold Cavity | Single |
Mold Life Time | 15 tons |
Tolerance | 0.01~0.1mm. |
Materials | Aluminium/Aluminum:6061,6063,6005,6082,7003 |
Surface Treatment | Sand blasting oxidation, wire drawing oxidation, powder spraying, fluorocarbon spraying and ect |
Process | Extrusion, aging, sawing, CNC machining, |
Packing Detail | Inner Packing: PE bag / EPE Foam Packing / Anti-Rust Paper Packing / Blister / SMT / Vacuum Packing / Plastic Box Packing / Color Box Packing. Outter Packing: Stretch Film Packing / Carton / Pallet / Wood Case or customized |
Models | 630T,800T,1350T,2200T,3000T,5000T,10000T |
Certificates | ISO 9001 quality management system certification,IATF16949 |
Product applications | Automotive industry, Bicycle and motorcycle, Door and windows and furniture, Household appliance, Power tool,LED lighting, Medical instrument parts, ect. |
Payment terms | TT and ect |
2500T, 4000T specifications of aluminum extrusion machine a total of 12, can produce all kinds of profiles, large section profiles; Stamping hydraulic equipment 50 sets, CNC machining center 210 sets. With oxidation, powder, electrophoresis, fluorocarbon painting production line, can be used for all kinds of surface treatment. In addition, there are 30 self-developed automatic polishing machines, as well as three coordinate meters for quality control testing.
Q1:Are you a factory or trading company?
A:We're a big-scale self-own factory,provide one-stop service for our customer,from material to various surface treatments,and from technical sales to shipping and to after-sales,so we can save the cost for client,control the quality and lead time,provide best service.
Q2:Where is your factory located?How can I visit there?
A:Our factory is located in Qingpu District of Shanghai City ,The nearest airport is Shanghai Hongqiao International Airport which is just about 30mins by car away from our factory.
Q3:What's the production time for new molds and mass production?
A:7-15 days(up to the different size) to build new molds.Mass production usually take around 20 days from one order which can be from 1 ton to 300 tons.And we can process urgently if needed.
Q4:What is the payment terms?
A:30% deposit by TT and balance settled before shipping or against BL copy.And LC is also acceptable.
Q5:What's the quality level of your product?
A:Our product are 100% quality checked.The quality are totally according to clients' requirements.And we have many kinds of quality certificate,such as ISO9001,IATF16949,RohS,SGS,etc.
Q6:Which markets are you selling to?
A:We have been selling to many countries,such as Germany,Japan,SouthKorea,UK,Singapore,France,Russia,Spain,Belgium,SouthAfrica,Nigeria,Madagascar,Dominica,Panama,Vietnam,Malaysia,Indonesia,Philippines,etc.